Solar Installation at The Oaks Poultry Farm
Client: The Oaks Poultry Farm
Location: Ditchling, Sussex
Sector: Agriculture
Service Provided: Solar PV Installation
Date: September 2025
Objectives
- Return on Investment (ROI): Achieve full payback in under three years, with long-term savings reinvested into farm operations.
- Carbon Footprint Reduction: Cut CO₂ emissions by approximately 18 tonnes annually.
- Grid Independence: Reduce reliance on grid electricity and protect against rising energy costs.
Our Solution
PDP Services designed and installed a bespoke solar energy system tailored to the farm’s needs:
- System Size: 57.5 kWp Solar PV
- Panels: 92 Aiko Comet 625W high-efficiency modules
- Inverter: 50 kW Solis inverter
- Installation: Trapezoidal barn roofs
- Monitoring: Ongoing performance tracking and energy management
Key Benefits
| Benefit | Impact |
|---|---|
| Annual Generation | 52,400 kWh of clean energy |
| Grid Import Reduction | 34% less reliance on the national grid |
| Carbon Savings | 18,000 kg CO₂ saved annually |
| Payback Period | Under 3 years |
| Grid Independence | 34% self-sufficiency |
Agricultural Impact
- Lower Bills: More funds for reinvestment into farm operations
- Sustainable Operations: Reduced environmental footprint
- Energy Security: Protection from rising energy costs
Results
The installation has helped the farm:
- Cut electricity bills significantly
- Reduce carbon emissions by over 18 tonnes per year
- Achieve over 30% energy independence
Download the case study here
Related Services
PDP Services is an experienced solar installer in Sussex. We design and install bespoke solar panel systems for homes and businesses in Burgess Hill, Sussex, and the surrounding areas. As well as solar panels, we install storage batteries and EV chargers.

Solar Installation at Burgess Hill Constitutional Club
Solar Installation at The Oaks Poultry Farm